Offsite prefabrication
Built in the shop. Installed in hours.
Conduit assemblies are engineered from the drawings, built and checked in our yard, then delivered to site ready to set. On the Long Beach Supercharger, every conduit for the main switchboard and all 8 power cabinets went in as one rack, in one pick.



STEP 1
Engineering and layout
Assemblies laid out from the plan set: spacing, bends and stub-up locations for every piece of gear.
STEP 2
Shop fabrication
Racks built on level ground by our crews, not in a trench.
STEP 3
QA/QC inspection
Every assembly checked against the drawings and stamped before it leaves the yard.
STEP 4
Delivery and install
Set in place with our own equipment, then backfilled.
5–10 daysSaved on the critical path
15–25%Fewer conduit labor hours
30–50%Shorter open-trench exposure
3–4×More sites per month at volume
Based on internal tracking across recent EV programs.