Electrify America · 2025
Santa Monica Flagship
- Scope
- 10 × 360 kW power units, 20 dispensers
- Challenge
- Dense urban corner lot, tight staging
- Delivered
- Full civil, electrical and utility tie-in
Recent work
Each site below was self-performed by our crews, civil and electrical, from mobilization through utility energization and closeout.
Electrify America · 2025
Tesla · 2026
EVgo · 2026
EVgo · 2025
Electrify America · 2025
300+yards of concreteTesla · Civil and utility
Trenching and LADWP service conduits, about 20,000 sq ft of grading, two driveway approaches, curb and gutter, 160+ ft of sidewalk and right-of-way work, and asphalt restoration.
Track record since 2016
Tier 1 subcontractor since 2016, through Black & Veatch and Overland.
Stall counts shown where known.
45 Electrify America battery storage sites and 11 charger swaps, statewide.
Heavy-duty truck charging, EVgo and independent networks.